IAC Assessment: GT0578
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0578
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Salad Dressings & Sauces
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $50,000,000-$100,000,000
# of Employees 240
Plant Area (Sq.Ft.) 100,000
Annual Production 60,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,846 7,598,476 kWh $0.04
Electricity Demand $114,589 9,080 kW-months/year $12.62
Electricity Fees $402 - $ -
Natural Gas $72,286 14,458 MMBtu $5.00
TOTAL ENERGY COSTS $550,531
RECOMMENDED SAVINGS* $98,466 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $76,156
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$21,137
Cost:
$50,000
- - - - - - - - $21,137 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$21,137
-
$
02: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$2,045
Cost:
$1,000
- - - - $2,045 609 - - - - -
-
kWh
-
-
kW-months/year
$2,045
609
MMBtu
-
-
Tgal
-
-
$
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$27,914
Cost:
$12,000
$8,529 341,149 $12,282 1,020 $4,260 852 $2,843 616,785 - - $8,529
341,149
kWh
$12,282
1,020
kW-months/year
$4,260
852
MMBtu
$2,843
616,785
Tgal
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,970
Cost:
$500
- - - - $3,970 793 - - - - -
-
kWh
-
-
kW-months/year
$3,970
793
MMBtu
-
-
Tgal
-
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$21,460
Cost:
-
- - - - - - - - $21,460 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$21,460
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,090
Cost:
$34,520
$8,045 321,805 $13,045 1,080 - - - - - - $8,045
321,805
kWh
$13,045
1,080
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$850
Cost:
$2,100
$467 18,757 $383 32 - - - - - - $467
18,757
kWh
$383
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$98,466
Cost:
$100,120
$17,041 681,711 $25,710 2,132 $10,275 2,254 $2,843 616,785 $42,597 - $17,041
681,711
kWh
$25,710
2,132
kW-months/year
$10,275
2,254
MMBtu
$2,843
616,785
Tgal
$42,597
-
$
TOTAL IMPLEMENTED Savings:
$76,156
Cost:
$98,020
$16,574 662,954 $25,327 2,100 $10,275 2,254 $2,843 616,785 $21,137 - $16,574
662,954
kWh
$25,327
2,100
kW-months/year
$10,275
2,254
MMBtu
$2,843
616,785
Tgal
$21,137
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes