Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 2035 | Pickles, Sauces, And Salad Dressings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0168 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $365 | $0 | Implemented |
IC0168 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,051 | $66,738 | Implemented |
IC0168 # 15 Y:2010 | 15 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $445 | $0 | Implemented |
IC0168 # 14 Y:2010 | 14 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,779 | $11,212 | Implemented |
IC0168 # 13 Y:2010 | 13 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $11,073 | $7,170 | Implemented |
IC0168 # 12 Y:2010 | 12 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,776 | $1,500 | Implemented |
IC0168 # 11 Y:2010 | 11 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,965 | $1,265 | Implemented |
IC0168 # 10 Y:2010 | 10 | 2010 | INCREASE AMOUNT OF CONDENSATE RETURNED | $16,738 | $18,200 | Implemented |
IC0168 # 09 Y:2010 | 09 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,934 | $1,949 | Implemented |
IC0168 # 08 Y:2010 | 08 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $2,615 | $800 | Implemented |
IC0168 # 07 Y:2010 | 07 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,111 | $0 | Implemented |
IC0168 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,166 | $0 | Implemented |
IC0168 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,327 | $29,969 | Implemented |
IC0168 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,400 | $419 | Implemented |
IC0168 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $1,372 | $3,624 | Implemented |
WI0127 # 09 Y:1991 | 09 | 1991 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $917,100 | $0 | Not Implemented |
WI0127 # 08 Y:1991 | 08 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $138 | $400 | Not Implemented |
WI0127 # 07 Y:1991 | 07 | 1991 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $389 | $283 | Not Implemented |
WI0127 # 06 Y:1991 | 06 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $140 | $276 | Not Implemented |
WI0127 # 05 Y:1991 | 05 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,019 | $0 | Not Implemented |
WI0127 # 04 Y:1991 | 04 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,042 | $2,560 | Not Implemented |
WI0127 # 03 Y:1991 | 03 | 1991 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $8,373 | $16,000 | Not Implemented |
WI0127 # 02 Y:1991 | 02 | 1991 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,150 | $7,000 | Not Implemented |
WI0127 # 01 Y:1991 | 01 | 1991 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,052 | $15,000 | Not Implemented |
WI0064 # 08 Y:1989 | 08 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $364 | $800 | Not Implemented |