IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
SIC 2038 Frozen Specialties, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1004 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,732 $6,990 Not Implemented
SU0471 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $529 $179 Not Implemented
SU0471 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $2,625 Implemented
SU0471 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $247 $271 Not Implemented
SU0471 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $955 $1,560 Not Implemented
SU0471 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $1,240 Implemented
SU0471 # 06 Y:2018 06 2018 INSULATE FEEDWATER TANK $75 $172 Implemented
SU0471 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $2,099 $6,608 Not Implemented
MA0788 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,698 $116,889 Not Implemented
MA0788 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,627 $17,006 Implemented
MA0788 # 01 Y:2018 01 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $98,644 $110,000 Implemented
MA0788 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,164 $6,660 Not Implemented
MA0788 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $4,116 $10,462 Implemented
MA0788 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $3,493 $1,750 Implemented
MA0788 # 07 Y:2018 07 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,043 $18,200 Not Implemented
TT0198 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $9,284 $50 Implemented
TT0198 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $7,752 $3,175 Implemented
TT0198 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,564 $34,509 Not Implemented
TT0198 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,495 $3,050 Not Implemented
TT0198 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $1,600 Implemented
UA0179 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $53,482 $100,000 Not Implemented
UA0179 # 02 Y:2017 02 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $44,167 $500 Not Implemented
UA0179 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,876 $42,452 Not Implemented
UA0179 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,851 $250 Implemented
UA0179 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,243 $1,165 Implemented