IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
SIC 2038 Frozen Specialties, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0872 # 04 Y:2010 04 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $487 $150,000 Implemented
GT0872 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,328 $20,000 Implemented
GT0872 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,710 $73,600 Not Implemented
GT0872 # 07 Y:2010 07 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,202 $20,000 Not Implemented
GT0872 # 08 Y:2010 08 2010 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $63,868 $350,000 Implemented
UW0036 # 01 Y:2010 01 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $30,860 $61,720 Not Implemented
UW0036 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,120 $1,590 Not Implemented
UW0036 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $1,039 $1,072 Not Implemented
UW0036 # 04 Y:2010 04 2010 $819 $45 Not Implemented
UW0036 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $417 $825 Not Implemented
TT0044 # 01 Y:2009 01 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,027 $5,400 Not Implemented
TT0044 # 02 Y:2009 02 2009 REDUCE VENTILATION AIR $3,415 $0 Implemented
TT0044 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $7,850 $6,000 Implemented
TT0044 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,180 $2,000 Implemented
TT0044 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,904 $30,870 Implemented
TT0044 # 06 Y:2009 06 2009 REPAIR OR REPLACE STEAM TRAPS $1,748 $4,000 Implemented
TT0044 # 07 Y:2009 07 2009 USE COMPRESSOR AIR FILTERS $323 $75 Implemented
TT0044 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,476 $4,900 Implemented
TT0044 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,198 $0 Not Implemented
TT0044 # 10 Y:2009 10 2009 DEVELOP A REPAIR/REPLACE POLICY $373 $976 Not Implemented
TT0041 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,330 $0 Implemented
TT0041 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,865 $0 Not Implemented
TT0041 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,503 $0 Implemented
TT0041 # 04 Y:2009 04 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,530 $0 Not Implemented
TT0041 # 05 Y:2009 05 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,530 $0 Not Implemented