IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0035 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,081 $374 Not Implemented
MU0035 # 06 Y:2023 06 2023 ELIMINATE/REDUCE AN OPERATION $13,378 $0 Not Implemented
MU0035 # 05 Y:2023 05 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $934 $0 Not Implemented
MU0035 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,453 $5,164 Not Implemented
MU0035 # 02 Y:2023 02 2023 KEEP EQUIPMENT CLEAN $216 $0 Not Implemented
MU0035 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,539 $0 Not Implemented
UM0312 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,862 $200 Not Implemented
UM0312 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $508 $276 Not Implemented
UM0312 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,355 $15,984 Not Implemented
UM0312 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,622 $800 Not Implemented
UM0312 # 09 Y:2006 09 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $857 $300 Not Implemented
UM0312 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,421 $100 Not Implemented
UM0312 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,826 $1,300 Not Implemented
UM0312 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,885 $2,250 Implemented
UM0312 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $15,410 $500 Not Implemented
UM0312 # 02 Y:2006 02 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,289 $4,200 Not Implemented
ND0322 # 02 Y:1999 02 1999 USE OPTIMUM TEMPERATURE $161 $0 Implemented
ND0322 # 06 Y:1999 06 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $65 $20 Not Implemented
ND0322 # 05 Y:1999 05 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,625 $4,000 Not Implemented
ND0322 # 04 Y:1999 04 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $2,056 $38,197 Not Implemented
ND0322 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,357 $1,250 Not Implemented
ND0322 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $639 $1,458 Not Implemented
UM0097 # 05 Y:1997 05 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $187,572 $28,169 Implemented
UM0097 # 03 Y:1997 03 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,254 $2,400 Not Implemented
UM0097 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $1,500 Implemented