IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0230 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $13,779 $15,504 n/a
DL0230 # 02 Y:2024 02 2024 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $44,058 $22,437 n/a
DL0230 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $100,915 $74,000 n/a
DL0230 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,146 $2,040 n/a
DL0230 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,418 $0 n/a
DL0230 # 06 Y:2024 06 2024 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $15,141 $10,000 n/a
DL0230 # 07 Y:2024 07 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,919 $2,200 n/a
LE0499 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $69,561 $53,200 Not Implemented
LE0499 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,216 $57,400 Not Implemented
LE0499 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,271 $5,600 Implemented
LE0499 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,388 $0 Implemented
LE0319 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,751 $160 Not Implemented
LE0319 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $30,212 $5,424 Implemented
LE0319 # 01 Y:2011 01 2011 MINIMIZE WATER USAGE $66,284 $168,000 Not Implemented
LE0319 # 04 Y:2011 04 2011 OPERATE BOILERS ON HIGH FIRE SETTING $16,771 $0 Implemented
LE0319 # 05 Y:2011 05 2011 METER WASTE WATER $10,797 $3,240 Not Implemented
LE0253 # 06 Y:2007 06 2007 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,436 $15,000 Not Implemented
LE0253 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,186 $1,000 Implemented
LE0253 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,349 $6,200 Implemented
LE0253 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $480 Not Implemented
LE0253 # 10 Y:2007 10 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,672 $2,500 Not Implemented
LE0253 # 05 Y:2007 05 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $20,819 $37,000 Implemented
LE0253 # 04 Y:2007 04 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,904 $300 Implemented
LE0253 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $22,542 $300 Implemented
LE0253 # 02 Y:2007 02 2007 ELIMINATE/REDUCE AN OPERATION $40,620 $4,000 Not Implemented