IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0433 # 10 Y:2010 10 2010 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,885 $816 Implemented
UF0433 # 06 Y:2010 06 2010 DEVELOP A REPAIR/REPLACE POLICY $621 $0 Implemented
UF0433 # 04 Y:2010 04 2010 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $21,987 $10,000 Not Implemented
UF0433 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,098 $314 Implemented
UF0433 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,138 $8,558 Not Implemented
UF0433 # 01 Y:2010 01 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,771 $2,321 Not Implemented
UF0433 # 07 Y:2010 07 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,610 $0 Implemented
UF0248 # 01 Y:2000 01 2000 APPLY FOR INVESTMENT INCENTIVES $15,000 $50 Not Implemented
UF0248 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $3,807 $5,000 Implemented
UF0248 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,019 $6,796 Implemented
UF0248 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,859 $600 Implemented
UF0248 # 05 Y:2000 05 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,292 $6,686 Implemented
UF0248 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,899 $1,159 Not Implemented
UF0248 # 07 Y:2000 07 2000 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,786 $909 Implemented
UF0248 # 08 Y:2000 08 2000 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $7,800 $500 Implemented
UF0248 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $98,800 $120,000 Not Implemented
UF0188 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,445 $451 Implemented
UF0188 # 10 Y:1997 10 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,752 $59,000 Not Implemented
UF0188 # 11 Y:1997 11 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $79,467 $273,000 Not Implemented
UF0188 # 09 Y:1997 09 1997 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $4,874 $4,840 Implemented
UF0188 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,535 $3,969 Implemented
UF0188 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $635 $640 Implemented
UF0188 # 03 Y:1997 03 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $477 $133 Implemented
UF0188 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $347 $347 Implemented
UF0188 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,344 $1,450 Implemented