Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 204 | Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0035 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,081 | $374 | Not Implemented |
MU0035 # 06 Y:2023 | 06 | 2023 | ELIMINATE/REDUCE AN OPERATION | $13,378 | $0 | Not Implemented |
MU0035 # 05 Y:2023 | 05 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $934 | $0 | Not Implemented |
MU0035 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,453 | $5,164 | Not Implemented |
MU0035 # 02 Y:2023 | 02 | 2023 | KEEP EQUIPMENT CLEAN | $216 | $0 | Not Implemented |
MU0035 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,539 | $0 | Not Implemented |
UM0312 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,862 | $200 | Not Implemented |
UM0312 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $508 | $276 | Not Implemented |
UM0312 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,355 | $15,984 | Not Implemented |
UM0312 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,622 | $800 | Not Implemented |
UM0312 # 09 Y:2006 | 09 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $857 | $300 | Not Implemented |
UM0312 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,421 | $100 | Not Implemented |
UM0312 # 07 Y:2006 | 07 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,826 | $1,300 | Not Implemented |
UM0312 # 05 Y:2006 | 05 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,885 | $2,250 | Implemented |
UM0312 # 01 Y:2006 | 01 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,410 | $500 | Not Implemented |
UM0312 # 02 Y:2006 | 02 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,289 | $4,200 | Not Implemented |
ND0322 # 02 Y:1999 | 02 | 1999 | USE OPTIMUM TEMPERATURE | $161 | $0 | Implemented |
ND0322 # 06 Y:1999 | 06 | 1999 | CONVERT TO AQUEOUS CLEANING SYSTEM | $65 | $20 | Not Implemented |
ND0322 # 05 Y:1999 | 05 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,625 | $4,000 | Not Implemented |
ND0322 # 04 Y:1999 | 04 | 1999 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $2,056 | $38,197 | Not Implemented |
ND0322 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,357 | $1,250 | Not Implemented |
ND0322 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $639 | $1,458 | Not Implemented |
UM0097 # 05 Y:1997 | 05 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $187,572 | $28,169 | Implemented |
UM0097 # 03 Y:1997 | 03 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,254 | $2,400 | Not Implemented |
UM0097 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,340 | $1,500 | Implemented |