Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 204 | Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0230 # 02 Y:2024 | 02 | 2024 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $44,058 | $22,437 | n/a |
DL0230 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $100,915 | $74,000 | n/a |
DL0230 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,146 | $2,040 | n/a |
DL0230 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,418 | $0 | n/a |
DL0230 # 06 Y:2024 | 06 | 2024 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $15,141 | $10,000 | n/a |
DL0230 # 07 Y:2024 | 07 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,919 | $2,200 | n/a |
DL0230 # 01 Y:2024 | 01 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $13,779 | $15,504 | n/a |
LE0499 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $69,561 | $53,200 | Not Implemented |
LE0499 # 01 Y:2021 | 01 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $60,388 | $0 | Implemented |
LE0499 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,216 | $57,400 | Not Implemented |
LE0499 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,271 | $5,600 | Implemented |
LE0319 # 01 Y:2011 | 01 | 2011 | MINIMIZE WATER USAGE | $66,284 | $168,000 | Not Implemented |
LE0319 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $30,212 | $5,424 | Implemented |
LE0319 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,751 | $160 | Not Implemented |
LE0319 # 04 Y:2011 | 04 | 2011 | OPERATE BOILERS ON HIGH FIRE SETTING | $16,771 | $0 | Implemented |
LE0319 # 05 Y:2011 | 05 | 2011 | METER WASTE WATER | $10,797 | $3,240 | Not Implemented |
LE0253 # 05 Y:2007 | 05 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $20,819 | $37,000 | Implemented |
LE0253 # 06 Y:2007 | 06 | 2007 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $12,436 | $15,000 | Not Implemented |
LE0253 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,186 | $1,000 | Implemented |
LE0253 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,349 | $6,200 | Implemented |
LE0253 # 09 Y:2007 | 09 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $8,342 | $480 | Not Implemented |
LE0253 # 10 Y:2007 | 10 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,672 | $2,500 | Not Implemented |
LE0253 # 04 Y:2007 | 04 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $20,904 | $300 | Implemented |
LE0253 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,542 | $300 | Implemented |
LE0253 # 02 Y:2007 | 02 | 2007 | ELIMINATE/REDUCE AN OPERATION | $40,620 | $4,000 | Not Implemented |