IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0384 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $25 Implemented
WV0384 # 09 Y:2008 09 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $364 $438 Implemented
WV0384 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $870 $308 Implemented
WV0384 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,609 $6,026 Implemented
WV0384 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $1,800 $11,500 Not Implemented
WV0384 # 05 Y:2008 05 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,872 $2,000 Not Implemented
WV0384 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $2,032 $577 Not Implemented
WV0384 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,084 $1,070 Not Implemented
WV0384 # 02 Y:2008 02 2008 DEVELOP A REPAIR/REPLACE POLICY $10,724 $1,094 Implemented
WV0384 # 01 Y:2008 01 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,545 $1,000 Not Implemented
WV0301 # 12 Y:2004 12 2004 INSULATE BARE EQUIPMENT $317 $117 Not Implemented
WV0301 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $30,817 $4,062 Implemented
WV0301 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,293 $0 Implemented
WV0301 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,362 $175 Implemented
WV0301 # 09 Y:2004 09 2004 BURN WASTE OIL FOR HEAT $1,799 $3,800 Not Implemented
WV0301 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,925 $120 Implemented
WV0301 # 07 Y:2004 07 2004 REPAIR OR REPLACE STEAM TRAPS $3,558 $1,000 Implemented
WV0301 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,898 $780 Not Implemented
WV0301 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,088 $1,890 Implemented
WV0301 # 04 Y:2004 04 2004 DEVELOP A REPAIR/REPLACE POLICY $6,476 $360 Implemented
WV0301 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,529 $14,877 Implemented
WV0301 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,918 $4,120 Implemented