IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0038 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,907 $150 Implemented
IA0038 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,673 $2,484 Not Implemented
IA0038 # 01 Y:1992 01 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,039 $9,600 Not Implemented
IA0038 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,925 $1,926 Not Implemented
IA0038 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $693 $1,875 Not Implemented
IA0038 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $848 $25 Not Implemented
AM0156 # 01 Y:1992 01 1992 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,260 $0 Not Implemented
AM0156 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $1,430 $0 Not Implemented
AM0156 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $2,900 $0 Implemented
AM0156 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $860 Implemented
AM0156 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,117 $3,200 Implemented
AM0156 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $10,125 $1,500 Implemented
OK0385 # 01 Y:1992 01 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $265 $280 Implemented
OK0385 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,839 $608 Implemented
OK0385 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $705 $2,000 Implemented
OK0385 # 04 Y:1992 04 1992 REPAIR AND ELIMINATE STEAM LEAKS $980 $0 Implemented
WI0145 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,069 $8,681 Not Implemented
WI0145 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,952 $5,672 Not Implemented
WI0145 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,330 $0 Implemented
WI0145 # 03 Y:1992 03 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,542 $0 Implemented
WI0145 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,026 $0 Not Implemented
WI0145 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $653 $640 Implemented
WI0145 # 06 Y:1992 06 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,365 $0 Not Implemented
WI0145 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,642 $500 Implemented
AM0142 # 05 Y:1992 05 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $760 $0 Implemented