IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0404 # 01 Y:1997 01 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,800 $5,000 Implemented
CO0404 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200 $0 Implemented
CO0404 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $440 Implemented
CO0404 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $365 $498 Implemented
CO0404 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $280 Implemented
UF0188 # 11 Y:1997 11 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $79,467 $273,000 Not Implemented
UF0188 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $347 $347 Implemented
UF0188 # 03 Y:1997 03 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $477 $133 Implemented
UF0188 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $635 $640 Implemented
UF0188 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,535 $3,969 Implemented
UF0188 # 10 Y:1997 10 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,752 $59,000 Not Implemented
UF0188 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,445 $451 Implemented
UF0188 # 06 Y:1997 06 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,996 $1,000 Not Implemented
UF0188 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,344 $1,450 Implemented
UF0188 # 09 Y:1997 09 1997 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $4,874 $4,840 Implemented
UF0188 # 08 Y:1997 08 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,503 $0 Implemented
NV0088 # 09 Y:1997 09 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $23,140 $17,160 Implemented
NV0088 # 07 Y:1997 07 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $5,400 $1,410 Implemented
NV0088 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $163 $86 Implemented
NV0088 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $2,073 $900 Implemented
NV0088 # 08 Y:1997 08 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $4,800 $500 Implemented
NV0088 # 10 Y:1997 10 1997 CLEAR AND RENT EXISTING SPACE $3,485 $4,950 Implemented
NV0088 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $669 $1,148 Implemented
NV0088 # 02 Y:1997 02 1997 INSTALL TIMERS AND/OR THERMOSTATS $6,653 $3,100 Implemented
NV0088 # 03 Y:1997 03 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $109 $39 Implemented