IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0646 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $469 $93 Implemented
OK0646 # 03 Y:2002 03 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $659 $0 Implemented
OK0646 # 04 Y:2002 04 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,960 $0 Implemented
OK0646 # 05 Y:2002 05 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $113 $60 Not Implemented
OK0646 # 06 Y:2002 06 2002 UPGRADE CONTROLS ON COMPRESSORS $1,858 $150 Not Implemented
OK0646 # 07 Y:2002 07 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $3,545 $5,270 Implemented
OK0646 # 08 Y:2002 08 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,334 $9,000 Not Implemented
OK0646 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $1,976 $3,150 Not Implemented
UD0655 # 05 Y:2002 05 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,914 $0 Not Implemented
UD0655 # 04 Y:2002 04 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,492 $500 Not Implemented
UD0655 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,888 $0 Not Implemented
UD0655 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,350 $1,122 Implemented
UD0655 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $147,420 $0 Implemented
UD0655 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,566 $3,665 Not Implemented
UD0655 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $2,418 Implemented
UD0655 # 08 Y:2002 08 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $909 $0 Not Implemented
IA0296 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,888 $436 Implemented
IA0296 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,082 $586 Not Implemented
IA0296 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $5,317 $1,800 Implemented
IA0296 # 04 Y:2002 04 2002 REPAIR OR REPLACE STEAM TRAPS $5,180 $1,320 Implemented
IA0296 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $341 $466 Not Implemented
IA0296 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $83,966 $138,450 Not Implemented
IA0296 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,371 $0 Not Implemented
IA0296 # 08 Y:2002 08 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,948 $6,025 Not Implemented
LL0143 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $259 $0 Implemented