Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 204 | Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0646 # 02 Y:2002 | 02 | 2002 | INSTALL SET-BACK TIMERS | $469 | $93 | Implemented |
OK0646 # 03 Y:2002 | 03 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $659 | $0 | Implemented |
OK0646 # 04 Y:2002 | 04 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,960 | $0 | Implemented |
OK0646 # 05 Y:2002 | 05 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $113 | $60 | Not Implemented |
OK0646 # 06 Y:2002 | 06 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $1,858 | $150 | Not Implemented |
OK0646 # 07 Y:2002 | 07 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,545 | $5,270 | Implemented |
OK0646 # 08 Y:2002 | 08 | 2002 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,334 | $9,000 | Not Implemented |
OK0646 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,976 | $3,150 | Not Implemented |
UD0655 # 05 Y:2002 | 05 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,914 | $0 | Not Implemented |
UD0655 # 04 Y:2002 | 04 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,492 | $500 | Not Implemented |
UD0655 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,888 | $0 | Not Implemented |
UD0655 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,350 | $1,122 | Implemented |
UD0655 # 01 Y:2002 | 01 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $147,420 | $0 | Implemented |
UD0655 # 06 Y:2002 | 06 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,566 | $3,665 | Not Implemented |
UD0655 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,204 | $2,418 | Implemented |
UD0655 # 08 Y:2002 | 08 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $909 | $0 | Not Implemented |
IA0296 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,888 | $436 | Implemented |
IA0296 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,082 | $586 | Not Implemented |
IA0296 # 03 Y:2002 | 03 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $5,317 | $1,800 | Implemented |
IA0296 # 04 Y:2002 | 04 | 2002 | REPAIR OR REPLACE STEAM TRAPS | $5,180 | $1,320 | Implemented |
IA0296 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $341 | $466 | Not Implemented |
IA0296 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $83,966 | $138,450 | Not Implemented |
IA0296 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,371 | $0 | Not Implemented |
IA0296 # 08 Y:2002 | 08 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,948 | $6,025 | Not Implemented |
LL0143 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $259 | $0 | Implemented |