IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0533 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $1,540 $740 Implemented
CO0533 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $860 $250 Implemented
CO0533 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $180 $228 Implemented
CO0533 # 05 Y:2003 05 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $13,050 $11,340 Not Implemented
CO0533 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,350 $8,010 Not Implemented
GT0769 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,869 $2,137 n/a
GT0769 # 04 Y:2003 04 2003 REPAIR AND ELIMINATE STEAM LEAKS $2,457 $300 n/a
GT0769 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $3,157 $2,000 n/a
GT0769 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $12,813 $0 n/a
GT0769 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,386 $41,000 n/a
SF0265 # 09 Y:2003 09 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,089 $19,616 Not Implemented
SF0265 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $1,420 $2,280 Implemented
SF0265 # 07 Y:2003 07 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $503 $824 Implemented
SF0265 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,600 $0 Implemented
SF0265 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $16,200 $8,976 Not Implemented
SF0265 # 04 Y:2003 04 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,934 $1,230 Not Implemented
SF0265 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $976 $286 Not Implemented
SF0265 # 02 Y:2003 02 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,384 $1,271 Implemented
SF0265 # 01 Y:2003 01 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,390 $380 Not Implemented
SF0265 # 10 Y:2003 10 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,614 $5,500 Not Implemented
UU0046 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,936 $5,500 Not Implemented
UU0046 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,075 $0 Not Implemented
UU0046 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $12,187 $14,400 Not Implemented
UU0046 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $6,168 $750 Not Implemented
UU0046 # 07 Y:2003 07 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,727 $3,889 Not Implemented