Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 204 | Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0187 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $9,400 | $14,500 | Not Implemented |
UU0187 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $735 | $1,470 | Implemented |
UU0187 # 02 Y:2021 | 02 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,910 | $10,200 | Not Implemented |
UU0187 # 04 Y:2021 | 04 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $750 | $870 | Not Implemented |
OK1047 # 01 Y:2021 | 01 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,181 | $17,737 | Implemented |
OK1047 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,774 | $6,045 | Implemented |
OK1047 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,212 | $1,242 | Implemented |
OK1047 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $876 | $500 | Implemented |
SD0607 # 06 Y:2021 | 06 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $794 | $760 | Not Implemented |
SD0607 # 08 Y:2021 | 08 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $487 | $540 | Not Implemented |
SD0607 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $481 | $706 | Not Implemented |
SD0607 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,289 | $2,741 | Not Implemented |
SD0607 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,753 | $568 | Not Implemented |
SD0607 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,885 | $2,100 | Not Implemented |
SD0607 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,809 | $38,800 | Not Implemented |
SD0607 # 01 Y:2021 | 01 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $26,888 | $500 | Not Implemented |
UU0180 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $12,454 | $25,000 | Not Implemented |
UU0180 # 02 Y:2021 | 02 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,938 | $33,750 | Not Implemented |
UU0180 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,182 | $4,000 | Implemented |
UU0180 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,073 | $13,873 | Implemented |
UU0180 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,445 | $6,445 | Not Implemented |
UU0180 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $776 | $126 | Implemented |
UU0180 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $503 | $503 | Not Implemented |
UU0180 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $425 | $815 | Not Implemented |
UU0180 # 09 Y:2021 | 09 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $323 | $227 | Implemented |