Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
347
matching recommendationsSIC | 2041 | Flour And Other Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0460 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,837 | $3,373 | n/a |
MI0460 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $1,057 | $1,380 | n/a |
MI0460 # 01 Y:2025 | 01 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $53,117 | $3,200 | n/a |
MI0460 # 06 Y:2025 | 06 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,938 | $8,638 | n/a |
MI0460 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,111 | $1,620 | n/a |
MI0460 # 07 Y:2025 | 07 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,172 | $100 | n/a |
MI0460 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $13,405 | $29,632 | n/a |
MI0460 # 02 Y:2025 | 02 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $46,085 | $240 | n/a |
MI0460 # 08 Y:2025 | 08 | 2025 | INSULATE BARE EQUIPMENT | $3,469 | $1,976 | n/a |
MZ0370 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,031 | $3,941 | n/a |
MZ0370 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $6,915 | $4,560 | n/a |
MZ0370 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,013 | $1,000 | n/a |
MZ0370 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,634 | $22,593 | n/a |
MZ0370 # 05 Y:2025 | 05 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,132 | $200 | n/a |
MZ0370 # 07 Y:2025 | 07 | 2025 | INSULATE BARE EQUIPMENT | $883 | $418 | n/a |
MZ0370 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,914 | $12,624 | n/a |
MZ0338 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,195 | $240 | Not Implemented |
MZ0338 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $60,112 | $127,747 | Implemented |
MZ0338 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $2,124 | $3,920 | Implemented |
MZ0338 # 02 Y:2023 | 02 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,823 | $860 | Implemented |
MZ0338 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,644 | $13,800 | Implemented |
MZ0338 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $576,991 | $4,487,250 | Not Implemented |
MI0417 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,705 | $18,960 | Not Implemented |
MI0417 # 06 Y:2022 | 06 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,907 | $580 | Not Implemented |
MI0417 # 07 Y:2022 | 07 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,772 | $2,740 | Not Implemented |