IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

189

matching recommendations
Reset
SIC 2044 Rice Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0295 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,128 $96,000 Not Implemented
AM0539 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,400 $52,400 Not Implemented
AM0539 # 01 Y:2008 01 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $163,000 $105,000 Not Implemented
AM0539 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,990 $0 Not Implemented
AM0539 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,140 $570 Not Implemented
AM0539 # 05 Y:2008 05 2008 OPTIMIZE PLANT POWER FACTOR $4,100 $15,230 Not Implemented
AM0539 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $605 Not Implemented
LL0247 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $333 $60 Implemented
LL0247 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,136 $1,373 Not Implemented
LL0247 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,342 $2,748 Not Implemented
LL0247 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $151 Implemented
LL0247 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $527 $150 Not Implemented
LL0247 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $120 Implemented
LL0248 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,463 $1,022 Implemented
LL0248 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,082 $20 Implemented
LL0248 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $320 $50 Not Implemented
LL0248 # 06 Y:2006 06 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $900 $300 Implemented
LL0248 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,816 $14,656 Not Implemented
LL0248 # 03 Y:2006 03 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,218 $80 Implemented
LL0248 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $959 $151 Implemented
LL0248 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $619 $150 Not Implemented
LL0235 # 05 Y:2005 05 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,720 $0 Not Implemented
LL0235 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,223 $0 Not Implemented
LL0235 # 01 Y:2005 01 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,498 $0 Not Implemented
LL0235 # 08 Y:2005 08 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $26,800 $0 Not Implemented