IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2047 Dog And Cat Food
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0549 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,549 $0 Implemented
WV0549 # 17 Y:2017 17 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $286 $1,075 Implemented
WV0549 # 16 Y:2017 16 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $308 $20 Implemented
WV0549 # 15 Y:2017 15 2017 UPGRADE CONTROLS ON COMPRESSORS $527 $2,000 Implemented
WV0549 # 14 Y:2017 14 2017 DEVELOP A REPAIR/REPLACE POLICY $1,016 $582 Implemented
WV0549 # 13 Y:2017 13 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,249 $75 Implemented
WV0549 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,680 $500 Implemented
WV0549 # 09 Y:2017 09 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,755 $0 Implemented
WV0549 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $2,345 $6,890 Implemented
WV0549 # 05 Y:2017 05 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,241 $1,000 Implemented
WV0549 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,263 $11,180 Implemented
WV0549 # 03 Y:2017 03 2017 USE PHOTOCELL CONTROLS $4,781 $0 Implemented
UD0720 # 15 Y:2005 15 2005 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $200 $340 Implemented
UD0720 # 13 Y:2005 13 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $390 $0 Implemented
UD0720 # 11 Y:2005 11 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $554 $0 Implemented
UD0720 # 10 Y:2005 10 2005 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,072 $2,000 Implemented
UD0720 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,280 $540 Implemented
UD0720 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,200 $225 Implemented
UD0720 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,757 $3,200 Implemented
UD0720 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $3,870 $6,000 Implemented
UD0720 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,769 $0 Implemented
UD0655 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $147,420 $0 Implemented
UD0655 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $2,418 Implemented
UD0655 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,350 $1,122 Implemented