IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 2048 Prepared Feeds, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0195 # 09 Y:2022 09 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $883 $1,000 Not Implemented
UU0195 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $3,908 Not Implemented
UU0195 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $1,910 $3,500 Not Implemented
UU0195 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,050 $218 Not Implemented
UU0195 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $3,620 $7,340 Not Implemented
UU0195 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,698 $20,000 Not Implemented
UU0195 # 03 Y:2022 03 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,645 $2,000 Not Implemented
UU0195 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,177 $25,216 Not Implemented
UU0195 # 01 Y:2022 01 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,680 $22,600 Not Implemented
UU0187 # 04 Y:2021 04 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $750 $870 Not Implemented
UU0187 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $9,400 $14,500 Not Implemented
UU0187 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,910 $10,200 Not Implemented
UU0187 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $735 $1,470 Implemented
UU0180 # 03 Y:2021 03 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,182 $4,000 Implemented
UU0180 # 09 Y:2021 09 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $323 $227 Implemented
UU0180 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $425 $815 Not Implemented
UU0180 # 07 Y:2021 07 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $503 $503 Not Implemented
UU0180 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $776 $126 Implemented
UU0180 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,445 $6,445 Not Implemented
UU0180 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,073 $13,873 Implemented
UU0180 # 02 Y:2021 02 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,938 $33,750 Not Implemented
UU0180 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $12,454 $25,000 Not Implemented
BS0085 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $736 $390 Not Implemented
BS0085 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $679 $2,240 Not Implemented
BS0085 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $348 $108 Not Implemented