IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0063 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $1,043 Implemented
WI0063 # 03 Y:1989 03 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,768 $1,750 Implemented
WI0063 # 01 Y:1989 01 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,384 $0 Implemented
WI0063 # 05 Y:1989 05 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,658 $4,000 Implemented
WI0063 # 04 Y:1989 04 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,284 $1,040 Implemented
OK0294 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,730 $818 Implemented
OK0294 # 02 Y:1989 02 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,202 $7,214 Implemented
OK0294 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,053 $8,840 Implemented
OK0294 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $555 $1,500 Implemented
OK0294 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $277 $229 Implemented
OK0294 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $7,140 Implemented
OR0054 # 04 Y:1989 04 1989 DIRECT WARMEST AIR TO COMBUSTION INTAKE $349 $900 Implemented
TN0373 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,407 $540 Implemented
TN0373 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,599 $1,800 Implemented
TN0373 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $46 $0 Implemented
TN0373 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,164 $180 Implemented
TN0373 # 02 Y:1989 02 1989 USE RADIANT HEATER FOR SPOT HEATING $7,050 $11,350 Implemented
TN0373 # 01 Y:1989 01 1989 OPERATE BOILERS ON HIGH FIRE SETTING $11,558 $20,160 Implemented
OR0054 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $147 $206 Implemented
OR0054 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,028 $1,000 Implemented
OK0277 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,198 $1,500 Implemented
OK0277 # 08 Y:1989 08 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,430 $834 Implemented
OK0277 # 06 Y:1989 06 1989 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,340 $12,000 Implemented
OK0277 # 01 Y:1989 01 1989 INSULATE FEEDWATER TANK $344 $212 Implemented
GT0370 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,594 $3,680 Implemented