Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0641 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $581 | $1,121 | Implemented |
OR0641 # 04 Y:2014 | 04 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,470 | $1,577 | Implemented |
OR0641 # 02 Y:2014 | 02 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,580 | $8,760 | Implemented |
OR0641 # 01 Y:2014 | 01 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,076 | $2,794 | Implemented |
AM0668 # 03 Y:2014 | 03 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,840 | $33,524 | Implemented |
AM0668 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,110 | $0 | Implemented |
AM0668 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,250 | $2,500 | Implemented |
CO0695 # 03 Y:2014 | 03 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $20,810 | $50 | Implemented |
CO0695 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,330 | $3,000 | Implemented |
CO0695 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,250 | $23,365 | Implemented |
UK1406 # 09 Y:2014 | 09 | 2014 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,736 | $2,479 | Implemented |
UK1406 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $930 | $1,845 | Implemented |
UK1406 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $18,647 | $49,610 | Implemented |
UK1406 # 02 Y:2014 | 02 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $20,868 | $60,000 | Implemented |
UK1406 # 01 Y:2014 | 01 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $84,218 | $192,800 | Implemented |
UK1406 # 05 Y:2014 | 05 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $13,621 | $15,000 | Implemented |
UK1406 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,190 | $0 | Implemented |
UK1406 # 10 Y:2014 | 10 | 2014 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $612 | $2,154 | Implemented |
UK1406 # 12 Y:2014 | 12 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,015 | $700 | Implemented |
UK1406 # 11 Y:2014 | 11 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $100 | $90 | Implemented |
UK1406 # 08 Y:2014 | 08 | 2014 | ADD AREA LIGHTING SWITCHES | $1,572 | $620 | Implemented |
LE0376 # 11 Y:2014 | 11 | 2014 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,052 | $20,066 | Implemented |
LE0376 # 09 Y:2014 | 09 | 2014 | INSTALL OCCUPANCY SENSORS | $3,381 | $11,736 | Implemented |
LE0376 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,345 | $17,700 | Implemented |
LE0376 # 06 Y:2014 | 06 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $22,081 | $10,500 | Implemented |