IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0349 # 02 Y:1991 02 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,460 $2,800 Not Implemented
KU0349 # 01 Y:1991 01 1991 ISOLATE HOT OR COLD EQUIPMENT $4,092 $5,200 Not Implemented
KU0349 # 08 Y:1991 08 1991 OPTIMIZE PLANT POWER FACTOR $1,702 $3,024 Not Implemented
KU0349 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $222 $380 Not Implemented
KU0349 # 11 Y:1991 11 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $128 $0 Not Implemented
AM0126 # 02 Y:1991 02 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,770 $710 Implemented
AM0126 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $185 $0 Implemented
AM0126 # 07 Y:1991 07 1991 PAY UTILITY BILLS ON TIME $225 $0 Implemented
AM0126 # 06 Y:1991 06 1991 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $410 $910 Implemented
AM0126 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $770 $320 Implemented
AM0126 # 04 Y:1991 04 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $725 $0 Implemented
AM0126 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $517 $95 Implemented
AM0126 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,450 $0 Implemented
AS0023 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,629 $2,688 Not Implemented
AS0023 # 05 Y:1991 05 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,762 $0 Not Implemented
AS0023 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,767 $14,294 Not Implemented
AS0023 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,589 $0 Not Implemented
AS0023 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,633 $440 Not Implemented
AS0023 # 02 Y:1991 02 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $230,323 $780,000 Not Implemented
AS0023 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,685 $1,000 Not Implemented
AS0023 # 08 Y:1991 08 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,627 $1,200 Not Implemented
AS0023 # 09 Y:1991 09 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,165 $2,000 Not Implemented
WI0115 # 10 Y:1991 10 1991 SHUT OFF PILOTS IN STANDBY EQUIPMENT $134 $0 Implemented
AS0023 # 10 Y:1991 10 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,543 $2,000 Not Implemented
AS0023 # 11 Y:1991 11 1991 IMPROVE LUBRICATION PRACTICES $1,470 $5,122 Not Implemented