IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0918 # 10 Y:2015 10 2015 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $1,481 $0 Implemented
OK0918 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,374 $0 Implemented
KU0364 # 03 Y:1992 03 1992 OPTIMIZE PLANT POWER FACTOR $4,116 $2,408 Implemented
KU0364 # 06 Y:1992 06 1992 KEEP BOILER TUBES CLEAN $561 $135 Implemented
KU0364 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $484 $771 Implemented
KU0364 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,102 $2,000 Implemented
OK0294 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,730 $818 Implemented
OK0294 # 02 Y:1989 02 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,202 $7,214 Implemented
OK0294 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,053 $8,840 Implemented
OK0294 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $555 $1,500 Implemented
OK0294 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $277 $229 Implemented
OK0294 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $7,140 Implemented
KU0129 # 12 Y:1984 12 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,428 $3,565 Implemented
KU0129 # 13 Y:1984 13 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,710 $960 Implemented
KU0129 # 15 Y:1984 15 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $495 $500 Implemented
KU0129 # 16 Y:1984 16 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $120 Implemented
KU0129 # 10 Y:1984 10 1984 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $5,557 $300 Implemented
KU0129 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,368 $3,000 Implemented
KU0129 # 09 Y:1984 09 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,264 $2,500 Implemented
KU0129 # 06 Y:1984 06 1984 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,922 $3,000 Implemented
KU0129 # 05 Y:1984 05 1984 INSTALL TURBULATORS $7,337 $2,000 Implemented
KU0129 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,366 $0 Implemented