IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0110 # 11 Y:1997 11 1997 REDUCE SCRAP PRODUCTION $41,809 $30,000 Implemented
NC0110 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $105 $109 Implemented
NC0110 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $363 $469 Implemented
NC0110 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $467 $240 Implemented
NC0110 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,602 $200 Implemented
AT0095 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $516 $900 Implemented
AT0095 # 10 Y:1988 10 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,861 $1,315 Implemented
AT0095 # 09 Y:1988 09 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,185 $0 Implemented
AT0095 # 08 Y:1988 08 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $524 $476 Implemented
AT0095 # 06 Y:1988 06 1988 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,105 $100 Implemented
AT0095 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $871 $500 Implemented
AT0095 # 03 Y:1988 03 1988 INSTALL TURBULATORS $602 $700 Implemented
AT0095 # 02 Y:1988 02 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $945 $500 Implemented
AT0052 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,174 $0 Implemented
AT0052 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,478 $713 Implemented
AT0052 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,108 $300 Implemented
AT0052 # 01 Y:1986 01 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $634 $600 Implemented
AT0035 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $385 $318 Implemented
AT0035 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $1,674 $200 Implemented
AT0035 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $326 $0 Implemented