Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
106
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0310 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $6,590 | $2,200 | n/a |
TT0310 # 02 Y:2024 | 02 | 2024 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,414 | $17,000 | n/a |
TT0310 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,227 | $9,500 | n/a |
TT0310 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,068 | $12,500 | n/a |
TT0310 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $335 | $75 | n/a |
TT0310 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,799 | $60 | n/a |
TT0310 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,939 | $3,600 | n/a |
TT0290 # 05 Y:2023 | 05 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $911 | $30 | Implemented |
TT0290 # 01 Y:2023 | 01 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $106,623 | $200,000 | Implemented |
TT0290 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $523 | $1,150 | Implemented |
TT0290 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $21,000 | $2,000 | Not Implemented |
TT0290 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,477 | $10,500 | Not Implemented |
TT0290 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,702 | $1,755 | Implemented |
TT0286 # 08 Y:2023 | 08 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $2,551 | $3,200 | Implemented |
TT0286 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,747 | $1,210 | Implemented |
TT0286 # 01 Y:2023 | 01 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $32,010 | $18,000 | Implemented |
TT0286 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,352 | $3,450 | Implemented |
TT0286 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,768 | $37,360 | Not Implemented |
TT0286 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $12,412 | $17,500 | Implemented |
TT0286 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $15,688 | $1,229 | Not Implemented |
TT0286 # 03 Y:2023 | 03 | 2023 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $15,950 | $900 | Implemented |
TT0166 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,809 | $3,000 | Implemented |
TT0166 # 01 Y:2016 | 01 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,985 | $7,200 | Not Implemented |
TT0166 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $1,393 | $585 | Not Implemented |
TT0166 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $13,610 | $7,891 | Not Implemented |