IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0290 # 01 Y:2023 01 2023 UPGRADE OBSOLETE EQUIPMENT $106,623 $200,000 Implemented
TT0290 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $1,755 Implemented
TT0290 # 05 Y:2023 05 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $911 $30 Implemented
TT0290 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $1,150 Implemented
TT0286 # 03 Y:2023 03 2023 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $15,950 $900 Implemented
TT0286 # 08 Y:2023 08 2023 AIR CONDITION ONLY SPACE NECESSARY $2,551 $3,200 Implemented
TT0286 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,352 $3,450 Implemented
TT0286 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,747 $1,210 Implemented
TT0286 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $12,412 $17,500 Implemented
TT0286 # 01 Y:2023 01 2023 AIR CONDITION ONLY SPACE NECESSARY $32,010 $18,000 Implemented
TT0166 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $11,418 $8,000 Implemented
TT0166 # 05 Y:2016 05 2016 INSTALL SUB-METERING EQUIPMENT $11,364 $600 Implemented
TT0166 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,809 $3,000 Implemented
TT0166 # 10 Y:2016 10 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $138 $120 Implemented
TT0166 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,168 $13,756 Implemented
TT0066 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $140 $30 Implemented
TT0021 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $702 $263 Implemented
TT0021 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $1,641 Implemented
TT0021 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $520 $1,700 Implemented
TT0021 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $1,243 Implemented
TT0021 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $947 $3,646 Implemented
TT0021 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,829 $15,912 Implemented
TT0021 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $3,500 $12,500 Implemented
TT0021 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,829 $15,912 Implemented
TT0021 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,957 $11,633 Implemented