IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0070 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $828 $94 Implemented
WM0070 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,038 $1,190 Implemented
WM0070 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,169 $995 Implemented
WM0070 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,279 $5,355 Implemented
WM0070 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $2,580 $570 Implemented
WM0070 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,528 $44,678 Implemented
WM0070 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $22,791 $20,960 Not Implemented
WM0070 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,447 $520 Implemented
WM0070 # 04 Y:2015 04 2015 USE RADIANT HEATER FOR SPOT HEATING $4,545 $6,320 Not Implemented
WI0398 # 02 Y:2001 02 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $120,634 $360,000 Not Implemented
WI0398 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $596 $0 Not Implemented
WI0398 # 05 Y:2001 05 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,260 $500 Not Implemented
WI0398 # 04 Y:2001 04 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,467 $18,150 Not Implemented
WI0398 # 03 Y:2001 03 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $116,146 $630,000 Not Implemented
WI0398 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $129,888 $20,000 Not Implemented
WI0115 # 01 Y:1991 01 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,437 $0 Implemented
WI0115 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,500 $10,000 Implemented
WI0115 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $261 $188 Implemented
WI0115 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $587 $240 Implemented
WI0115 # 05 Y:1991 05 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $313 $2,100 Implemented
WI0115 # 06 Y:1991 06 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $370 $1,400 Implemented
WI0115 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $200 $0 Implemented
WI0115 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $186 $200 Implemented
WI0115 # 09 Y:1991 09 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $160 $200 Implemented
WI0115 # 10 Y:1991 10 1991 SHUT OFF PILOTS IN STANDBY EQUIPMENT $134 $0 Implemented