IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0104 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $735 $297 Implemented
WV0104 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $516 $2,274 Implemented
WV0104 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $214 $111 Not Implemented
WV0104 # 09 Y:1996 09 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,260 $4,010 Not Implemented
WV0104 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $558 $720 Implemented
WV0104 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $100 Implemented
WV0104 # 07 Y:1996 07 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,485 $480 Implemented
WV0104 # 06 Y:1996 06 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,183 $1,467 Not Implemented
WV0104 # 10 Y:1996 10 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $21,780 $0 Implemented
WV0104 # 08 Y:1996 08 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,392 $1,000 Not Implemented
CO0375 # 04 Y:1996 04 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $660 $1,420 Not Implemented
CO0375 # 07 Y:1996 07 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $39 $92 Implemented
CO0375 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $330 $460 Not Implemented
CO0375 # 05 Y:1996 05 1996 REPAIR AND ELIMINATE STEAM LEAKS $610 $30 Implemented
CO0375 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $760 $150 Implemented
CO0375 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $2,445 Implemented
CO0375 # 01 Y:1996 01 1996 USE RADIANT HEATER FOR SPOT HEATING $1,740 $10,200 Not Implemented
AS0185 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $590 $1,236 Not Implemented
AS0185 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $128 Implemented
AS0185 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $1,230 $1,050 Not Implemented
AS0185 # 06 Y:1996 06 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $688 $1,400 Not Implemented
AS0185 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,378 $1,938 Implemented
AS0185 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $882 $100 Implemented
AS0185 # 03 Y:1996 03 1996 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $416 $120 Implemented
AS0185 # 02 Y:1996 02 1996 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,309 $255 Implemented