Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0142 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,986 $0 Not Implemented
LL0142 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $554 $289 Implemented
LL0142 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $406 $45 Not Implemented
LL0142 # 05 Y:2002 05 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $14,301 $0 Not Implemented
LL0142 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,508 $3,000 Implemented
SD0295 # 04 Y:2002 04 2002 USE PHOTOCELL CONTROLS $1,578 $1,000 Implemented
SD0295 # 09 Y:2002 09 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $5,965 $3,500 Not Implemented
SD0295 # 08 Y:2002 08 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $416,352 $655,000 Implemented
SD0295 # 07 Y:2002 07 2002 RECOVER AND REUSE WASTE MATERIAL $198,000 $15,000 Not Implemented
SD0295 # 06 Y:2002 06 2002 INSTALL SKYLIGHTS $543 $1,200 Not Implemented
SD0295 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,373 $3,000 Not Implemented
SD0295 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,967 $0 Not Implemented
SD0295 # 02 Y:2002 02 2002 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,840 $0 Not Implemented
SD0295 # 01 Y:2002 01 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $9,645 $200 Not Implemented
LM0033 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $237,812 $70,000 Not Implemented
LM0033 # 09 Y:2002 09 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $90,240 $34,800 Not Implemented
LM0033 # 10 Y:2002 10 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $231,120 $395,000 Not Implemented
LM0033 # 01 Y:2002 01 2002 INSTALL SKYLIGHTS $6,143 $10,400 Not Implemented
LM0033 # 02 Y:2002 02 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,578 $0 Not Implemented
LM0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,854 $370 Not Implemented
LM0033 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $23,073 $31,000 Not Implemented
LM0033 # 05 Y:2002 05 2002 USE OPTIMUM THICKNESS INSULATION $64,833 $96,800 Not Implemented
LM0033 # 06 Y:2002 06 2002 UTILIZE OUTSIDE CONTRACTING $22,623 $12,000 Not Implemented
LM0033 # 07 Y:2002 07 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $243,003 $208,000 Not Implemented
MI0029 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,287 $1,550 Implemented