IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0495 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,370 $6,127 Implemented
SF0495 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,562 $3,136 Not Implemented
SF0495 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,447 $8,329 Implemented
SF0495 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $2,590 $6,532 Implemented
SF0495 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,109 $0 Not Implemented
SF0495 # 01 Y:2016 01 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,207 $661 Implemented
BD0493 # 05 Y:2016 05 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,280 $50 n/a
BD0493 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $925 $1,050 n/a
BD0493 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $500 n/a
BD0493 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $932 $20 n/a
BD0493 # 01 Y:2016 01 2016 USE RADIANT HEATER FOR SPOT HEATING $17,520 $1,900 n/a
BD0493 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,620 $6,000 n/a
BD0493 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,605 $600 n/a
BD0493 # 02 Y:2016 02 2016 REPLACE BOILER $7,259 $14,000 n/a
OK0953 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,868 $150 Not Implemented
OK0953 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,120 $11,488 Implemented
OK0953 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $6,882 $3,675 Not Implemented
OK0953 # 04 Y:2016 04 2016 USE RADIANT HEATER FOR SPOT HEATING $9,116 $27,880 Not Implemented
UD0956 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,421 $14,000 Not Implemented
UD0956 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,229 $0 Not Implemented
UD0956 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $8,199 $12,220 Not Implemented
UD0956 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $26,938 $30,000 Not Implemented
UD0956 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,566 $24,600 Not Implemented
UD0956 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,966 $3,394 Not Implemented
UD0956 # 09 Y:2016 09 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,433 $40,000 Not Implemented