IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0988 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $7,394 $12,000 Not Implemented
OK0988 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $739 $2,330 Not Implemented
OK0988 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,279 $15,642 Not Implemented
OK0988 # 04 Y:2018 04 2018 USE SOLAR HEAT TO HEAT WATER $4,920 $155,149 Not Implemented
SD0569 # 01 Y:2018 01 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $53,280 $265,840 Not Implemented
SD0569 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,921 $2,000 Implemented
SD0569 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,832 $13,363 Implemented
SD0569 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,555 $6,800 Not Implemented
SD0569 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $2,839 $11,100 Implemented
SU0461 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $27,679 Implemented
SU0461 # 05 Y:2018 05 2018 REPLACE BOILER $10,937 $22,000 Not Implemented
SU0461 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $397 Implemented
SU0461 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $910 $651 Not Implemented
SU0461 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,138 $700 Implemented
SU0461 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,315 $0 Not Implemented
SU0461 # 07 Y:2018 07 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $315 $955 Implemented
UF0515 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,453 $512 Implemented
UF0515 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,553 $2,800 Implemented
UF0515 # 04 Y:2018 04 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,421 $29,224 Implemented
UF0515 # 01 Y:2018 01 2018 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $293,173 $1,270,000 Not Implemented
UF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,829 $63,355 Implemented
UF0515 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,104 $23,300 Implemented
UA0189 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $21,964 $45,000 Not Implemented
UA0189 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,745 $5,828 Implemented
UA0189 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,704 $100 Implemented