IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

880

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TP0015 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,056 $0 Implemented
OD0146 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $185 $90 Implemented
OD0146 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $85 $20 Implemented
OD0146 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $643 $0 Implemented
CO0446 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $400 $1,000 Implemented
CO0446 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0446 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $530 $0 Implemented
AR0155 # 01 Y:1998 01 1998 REPLACE BOILER $2,248 $8,260 Implemented
AR0155 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24 $25 Implemented
AR0155 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $43 $0 Implemented
AR0155 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,154 $304 Implemented
OK0546 # 02 Y:1998 02 1998 INSTALL SOLID WASTE INCINERATOR FOR HEAT $10,400 $7,900 Implemented
OK0546 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,438 $5,916 Implemented
OK0546 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,273 $2,460 Implemented
OK0546 # 07 Y:1998 07 1998 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,398 $500 Implemented
OK0546 # 10 Y:1998 10 1998 INSULATE BARE EQUIPMENT $176 $542 Implemented
OR0315 # 01 Y:1998 01 1998 UPGRADE CONTROLS ON COMPRESSORS $6,113 $4,480 Implemented
OR0315 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $964 $1,000 Implemented
SF0134 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,778 $0 Implemented
SF0134 # 03 Y:1998 03 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $622 $390 Implemented
SF0134 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,279 $2,814 Implemented
SF0134 # 05 Y:1998 05 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,457 $30,000 Implemented
SF0134 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,458 $71,304 Implemented
SF0134 # 07 Y:1998 07 1998 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,216 $8,500 Implemented
SF0134 # 08 Y:1998 08 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,339 $250 Implemented