Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
880
matching recommendationsSIC | 2051 | Bread, Cake, And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2215 # 03 Y:2022 | 03 | 2022 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $72,450 | $2,400 | Implemented |
LS2215 # 04 Y:2022 | 04 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $631 | $75 | Implemented |
LS2215 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,461 | $270 | Implemented |
LS2215 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $247 | $100 | Implemented |
LS2215 # 07 Y:2022 | 07 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $49,680 | $58,020 | Implemented |
KS2201 # 09 Y:2022 | 09 | 2022 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $13,164 | $120 | Implemented |
KS2201 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,572 | $61,880 | Implemented |
KS2201 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $39,082 | $154,800 | Implemented |
KS2201 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,137 | $60 | Implemented |
KS2201 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,955 | $5,480 | Implemented |
UL2203 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $79,271 | $45,460 | Implemented |
UL2203 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,985 | $0 | Implemented |
UL2203 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,530 | $37,026 | Implemented |
LS2212 # 01 Y:2022 | 01 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $572 | $0 | Implemented |
LS2212 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,007 | $360 | Implemented |
LS2212 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $545 | $150 | Implemented |
LS2212 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $389 | $468 | Implemented |
UF0574 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,729 | $322,608 | Implemented |
UF0574 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $38,315 | $45,847 | Implemented |
UF0574 # 03 Y:2022 | 03 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $22,318 | $12,420 | Implemented |
UF0574 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,484 | $20,340 | Implemented |
UF0574 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,896 | $25,258 | Implemented |
UF0574 # 06 Y:2022 | 06 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $5,512 | $600 | Implemented |
UF0574 # 15 Y:2022 | 15 | 2022 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,082 | $88 | Implemented |
UF0574 # 14 Y:2022 | 14 | 2022 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $18,108 | $45,538 | Implemented |