IAC Assessment: UF0574
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0574
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 15
Plant Area (Sq.Ft.) 125,000
Annual Production 31,443 Tons
Production Hrs. Annual 7,748
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $440,610 8,521,765 kWh $0.05
Electricity Demand $104,181 15,009 kW-months/year $6.94
Electricity Fees $84,381 - $ -
Natural Gas $116,215 55,248 MMBtu $2.10
TOTAL ENERGY COSTS $797,465
RECOMMENDED SAVINGS* $503,154 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $496,452
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $ $ $ $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$57,729
Cost:
$322,608
$31,079 597,668 $26,650 3,840 - - - - - - - - - - - - - - $31,079
597,668
kWh
$26,650
3,840
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$38,315
Cost:
$45,847
$31,019 596,524 $7,296 1,051 - - - - - - - - - - - - - - $31,019
596,524
kWh
$7,296
1,051
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$22,318
Cost:
$12,420
$(-1,414) (-27,200) $(-292) (-42) - - - - - - - - - - - - $24,024 - $(-1,414)
(-27,200)
kWh
$(-292)
(-42)
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
$24,024
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,484
Cost:
$20,340
$10,410 200,187 $3,074 443 - - - - - - - - - - - - - - $10,410
200,187
kWh
$3,074
443
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,896
Cost:
$25,258
$6,451 124,057 $1,445 208 - - - - - - - - - - - - - - $6,451
124,057
kWh
$1,445
208
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$5,512
Cost:
$600
$1,288 24,762 - - - - - - - - $4,224 - - - - - - - $1,288
24,762
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$4,224
-
$
-
-
$
-
-
$
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,422
Cost:
$24,763
- - - - - - - - - - - - - - $5,422 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
$5,422
-
$
-
-
$
08: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$3,103
Cost:
$14,366
$3,103 59,669 - - - - - - - - - - - - - - - - $3,103
59,669
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.1222 INSTALL TURBULATORS Savings:
$2,101
Cost:
$7,500
- - - - $2,101 999 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,101
999
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,498
Cost:
$7,375
- - - - $1,498 712 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,498
712
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
11: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$287,926
Cost:
-
- - - - - - - - - - - - - - - - $287,926 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
$287,926
-
$
12: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$22,157
Cost:
-
$22,157 426,088 - - - - - - - - - - - - - - - - $22,157
426,088
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
13: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$16,503
Cost:
$80,000
$1,835 35,290 $6,308 909 - - - - - - $8,360 - - - - - - - $1,835
35,290
kWh
$6,308
909
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$8,360
-
$
-
-
$
-
-
$
-
-
$
14: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$18,108
Cost:
$45,538
- - - - - - $7,323 2,579 $12,791 2,579 $(-1,100) - $(-906) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,323
2,579
Tgal
$12,791
2,579
Tgal
$(-1,100)
-
$
$(-906)
-
$
-
-
$
-
-
$
15: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,082
Cost:
$88
- - - - - - $394 139 $688 139 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$394
139
Tgal
$688
139
Tgal
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$503,154
Cost:
$606,703
$105,928 2,037,045 $44,481 6,409 $3,599 1,711 $7,717 2,718 $13,479 2,718 $11,484 - $(-906) - $5,422 - $311,950 - $105,928
2,037,045
kWh
$44,481
6,409
kW-months/year
$3,599
1,711
MMBtu
$7,717
2,718
Tgal
$13,479
2,718
Tgal
$11,484
-
$
$(-906)
-
$
$5,422
-
$
$311,950
-
$
TOTAL IMPLEMENTED Savings:
$496,452
Cost:
$577,462
$102,825 1,977,376 $44,481 6,409 - - $7,717 2,718 $13,479 2,718 $11,484 - $(-906) - $5,422 - $311,950 - $102,825
1,977,376
kWh
$44,481
6,409
kW-months/year
-
-
MMBtu
$7,717
2,718
Tgal
$13,479
2,718
Tgal
$11,484
-
$
$(-906)
-
$
$5,422
-
$
$311,950
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Primary Product