IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

880

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0166 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,168 $13,756 Implemented
TT0166 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $11,418 $8,000 Implemented
TT0166 # 05 Y:2016 05 2016 INSTALL SUB-METERING EQUIPMENT $11,364 $600 Implemented
TT0166 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,809 $3,000 Implemented
TT0166 # 10 Y:2016 10 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $138 $120 Implemented
IP0048 # 02 Y:2015 02 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,379 $5 Implemented
IP0048 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,718 $5 Implemented
IP0048 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $902 $45 Implemented
IP0048 # 05 Y:2015 05 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,880 $430 Implemented
IP0048 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,176 $8,753 Implemented
IP0048 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $413 Implemented
IP0047 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,458 $163 Implemented
IP0047 # 05 Y:2015 05 2015 APPLY FOR INVESTMENT INCENTIVES $30,801 $10,000 Implemented
IP0047 # 06 Y:2015 06 2015 APPLY FOR INVESTMENT INCENTIVES $10,288 $5,000 Implemented
IA0535 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,967 $2,059 Implemented
IA0535 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,020 $10,595 Implemented
IA0535 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,091 $70 Implemented
IA0535 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,318 $3,120 Implemented
IA0535 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $466 $710 Implemented
SF0471 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $554 $134 Implemented
SF0470 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,220 $4,488 Implemented
SF0470 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,421 $3,541 Implemented
SF0470 # 03 Y:2015 03 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $26,563 $30,811 Implemented
SF0470 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,546 $11,844 Implemented
SF0470 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,206 $17,797 Implemented