Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsSIC | 2051 | Bread, Cake, And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0134 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $99,039 | $135,000 | Implemented |
MI0134 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,221 | $10,000 | Not Implemented |
MI0134 # 03 Y:2006 | 03 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $45,075 | $16,854 | Not Implemented |
MI0134 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,182 | $964 | Implemented |
MI0134 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,015 | $780 | Not Implemented |
MI0134 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,709 | $30 | Implemented |
MI0128 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $78,238 | $4,445 | Not Implemented |
MI0128 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,974 | $5,000 | Not Implemented |
MI0128 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,372 | $31,540 | Implemented |
MI0128 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,248 | $1,750 | Not Implemented |
MI0128 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,703 | $1,074 | Implemented |
MI0128 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,762 | $4,800 | Not Implemented |
MI0128 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,984 | $30 | Implemented |
MI0029 # 01 Y:2002 | 01 | 2002 | METER WASTE WATER | $73,069 | $3,650 | Not Implemented |
MI0029 # 02 Y:2002 | 02 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $55,380 | $42,432 | Not Implemented |
MI0029 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,287 | $1,550 | Implemented |
MI0029 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,657 | $2,122 | Implemented |
MI0029 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,668 | $3 | Implemented |
MI0010 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,160 | $1,009 | Implemented |
MI0010 # 02 Y:2001 | 02 | 2001 | METER WASTE WATER | $3,711 | $3,650 | Implemented |
MI0010 # 03 Y:2001 | 03 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $47,345 | $7,000 | Implemented |
MI0010 # 04 Y:2001 | 04 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,000 | $5,000 | Implemented |
MI0010 # 05 Y:2001 | 05 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,511 | $6,500 | Not Implemented |
UF0177 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,139 | $2,865 | Not Implemented |
UF0177 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $82 | $82 | Implemented |