IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,839

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0023 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,589 $0 Not Implemented
AS0023 # 08 Y:1991 08 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,627 $1,200 Not Implemented
AS0023 # 09 Y:1991 09 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,165 $2,000 Not Implemented
AS0023 # 10 Y:1991 10 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,543 $2,000 Not Implemented
AS0023 # 11 Y:1991 11 1991 IMPROVE LUBRICATION PRACTICES $1,470 $5,122 Not Implemented
AS0023 # 12 Y:1991 12 1991 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,237 $6,400 Not Implemented
CO0209 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $760 $2,147 Implemented
CO0209 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,050 $1,000 Implemented
CO0209 # 03 Y:1991 03 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $900 $1,500 Implemented
CO0209 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $670 $2,790 Implemented
MO0020 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,528 $995 Not Implemented
MO0020 # 02 Y:1991 02 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $3,503 $1,755 Not Implemented
MO0020 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $320 $320 Not Implemented
MO0020 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $695 $1,318 Not Implemented
MO0020 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $687 $70 Not Implemented
MO0020 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $0 Not Implemented
MO0020 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $139 $0 Not Implemented
OR0100 # 01 Y:1990 01 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $22,304 $0 Implemented
OR0100 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,888 $2,677 Not Implemented
OR0100 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,591 $2,350 Not Implemented
OR0100 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $6,420 $13,800 Implemented
UD0328 # 01 Y:1990 01 1990 REDUCE VENTILATION AIR $409 $1,000 Implemented
UD0328 # 02 Y:1990 02 1990 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,201 $3,000 Not Implemented
UD0328 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,019 $0 Implemented
UD0328 # 04 Y:1990 04 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,328 $400 Not Implemented