IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0239 # 17 Y:2003 17 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $2,000 $500 Not Implemented
BD0239 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,591 $0 Not Implemented
BD0239 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,133 $4,850 Implemented
BD0239 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,532 $2,000 Implemented
BD0239 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,876 $4,580 Implemented
BD0239 # 06 Y:2003 06 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,041 $2,000 Not Implemented
BD0239 # 05 Y:2003 05 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $5,974 $2,300 Implemented
BD0239 # 04 Y:2003 04 2003 INSTALL SKYLIGHTS $6,436 $3,500 Not Implemented
BD0239 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,587 $1,000 Implemented
BD0239 # 02 Y:2003 02 2003 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $14,284 $500 Implemented
BD0239 # 01 Y:2003 01 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $209,343 $52,500 Not Implemented
BD0239 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $1,457 $675 Implemented
BD0239 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $1,290 Implemented
BD0239 # 13 Y:2003 13 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $318 Implemented
BD0239 # 15 Y:2003 15 2003 CHANGE OPERATING CONDITIONS $63,779 $10,000 Implemented
BD0239 # 16 Y:2003 16 2003 PAY BILLS ON TIME TO AVOID LATE FEES $1,048 $0 Not Implemented
BD0239 # 14 Y:2003 14 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,140 $1,000 Implemented
AS0362 # 01 Y:2003 01 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $577 $0 Implemented
AS0362 # 05 Y:2003 05 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $16,801 $2,470 Implemented
AS0362 # 04 Y:2003 04 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $6,720 $4,060 Implemented
AS0362 # 03 Y:2003 03 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $922 $4,350 Implemented
AS0362 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $141 $450 Not Implemented
SD0328 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,323 $0 Implemented
SD0328 # 08 Y:2003 08 2003 REDESIGN PROCESS $55,557 $24,000 Not Implemented
SD0328 # 01 Y:2003 01 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $269,910 $1,371,000 Implemented