IAC logo
IAC Assessment: BD0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2003
Principal Product Soft Buns and Rolls
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 97,000
Annual Production 420,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $250,715 6,266,016 kWh $0.04
Electricity Demand $111,955 12,785 kW-months/year $8.76
Electricity Fees $6,618 - $ -
Natural Gas $527,015 91,742 MMBtu $5.74
TOTAL ENERGY COSTS $933,306
RECOMMENDED SAVINGS* $330,236 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $106,777
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$209,343
Cost:
$52,500
$362,670 6,266,002 - - $(-210,349) (-36,627) - - $57,022 - - - - - - - $362,670
6,266,002
kWh
-
-
kW-months/year
$(-210,349)
(-36,627)
MMBtu
-
-
lb
$57,022
-
$
-
-
$
-
-
$
-
-
$
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$14,284
Cost:
$500
$7,055 115,956 $18,956 5,864 $(-11,727) 2,042 - - - - - - - - - - $7,055
115,956
kWh
$18,956
5,864
kW-months/year
$(-11,727)
2,042
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,587
Cost:
$1,000
$7,097 177,413 $2,490 284 - - - - - - - - - - - - $7,097
177,413
kWh
$2,490
284
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$6,436
Cost:
$3,500
$1,980 49,511 $2,085 238 - - - - $948 - - - $1,423 - - - $1,980
49,511
kWh
$2,085
238
kW-months/year
-
-
MMBtu
-
-
lb
$948
-
$
-
-
$
$1,423
-
$
-
-
$
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$5,974
Cost:
$2,300
- - - - $5,974 1,040 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,974
1,040
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$3,041
Cost:
$2,000
$(-125) (-3,120) $(-53) (-6) $3,219 561 - - - - - - - - - - $(-125)
(-3,120)
kWh
$(-53)
(-6)
kW-months/year
$3,219
561
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,876
Cost:
$4,580
$2,277 56,869 $599 68 - - - - - - - - - - - - $2,277
56,869
kWh
$599
68
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,532
Cost:
$2,000
$1,874 46,860 $658 75 - - - - - - - - - - - - $1,874
46,860
kWh
$658
75
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,133
Cost:
$4,850
$731 18,282 $257 29 - - - - $(-522) - - - $1,667 - - - $731
18,282
kWh
$257
29
kW-months/year
-
-
MMBtu
-
-
lb
$(-522)
-
$
-
-
$
$1,667
-
$
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,591
Cost:
-
- - $1,591 29,499 - - - - - - - - - - - - -
-
kWh
$1,591
29,499
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,457
Cost:
$675
$949 23,720 $508 58 - - - - - - - - - - - - $949
23,720
kWh
$508
58
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$704
Cost:
$1,290
$584 14,602 $120 14 - - - - - - - - - - - - $584
14,602
kWh
$120
14
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$311
Cost:
$318
$133 3,329 $40 5 - - - - $58 - - - $80 - - - $133
3,329
kWh
$40
5
kW-months/year
-
-
MMBtu
-
-
lb
$58
-
$
-
-
$
$80
-
$
-
-
$
14: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,140
Cost:
$1,000
- - - - - - $3,140 360,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,140
360,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
15: 4.632 CHANGE OPERATING CONDITIONS Savings:
$63,779
Cost:
$10,000
- - - - $37,203 6,478 - - - - $26,576 - - - - - -
-
kWh
-
-
kW-months/year
$37,203
6,478
MMBtu
-
-
lb
-
-
$
$26,576
-
$
-
-
$
-
-
$
16: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,048
Cost:
-
- - - - - - - - - - - - - - $1,048 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$1,048
-
$
17: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$2,000
Cost:
$500
- - - - - - - - - - - - - - $2,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$2,000
-
$
TOTAL RECOMMENDED Savings:
$330,236
Cost:
$87,013
$385,225 6,769,424 $27,251 36,128 $(-175,680) (-26,506) $3,140 360,000 $57,506 - $26,576 - $3,170 - $3,048 - $385,225
6,769,424
kWh
$27,251
36,128
kW-months/year
$(-175,680)
(-26,506)
MMBtu
$3,140
360,000
lb
$57,506
-
$
$26,576
-
$
$3,170
-
$
$3,048
-
$
TOTAL IMPLEMENTED Savings:
$106,777
Cost:
$28,513
$20,700 457,031 $23,628 6,397 $31,450 9,560 $3,140 360,000 $(-464) - $26,576 - $1,747 - - - $20,700
457,031
kWh
$23,628
6,397
kW-months/year
$31,450
9,560
MMBtu
$3,140
360,000
lb
$(-464)
-
$
$26,576
-
$
$1,747
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost