Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2003 |
Principal Product | cake and bread |
NAICS | 311812 - Commercial Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 20 Tons |
Production Hrs. Annual | 4,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $259,516 | 2,960,102 | kWh | $0.09 |
Electricity Demand | $90,643 | 6,925 | kW-months/year | $13.09 |
Natural Gas | $98,835 | 18,680 | MMBtu | $5.29 |
TOTAL ENERGY COSTS | $474,274 | |||
RECOMMENDED SAVINGS* | $752,603 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $272,233 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $269,910 Cost: $1,371,000 |
$164,454 | 1,865,460 | $71,786 | 5,484 | $33,670 | 63,637 | - | - | - | - | - | - |
$164,454 1,865,460 kWh |
$71,786 5,484 kW-months/year |
$33,670 63,637 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7145 INSTALL SKYLIGHTS |
Savings: $5,260 Cost: $6,650 |
$2,556 | 28,980 | $2,704 | 207 | - | - | - | - | - | - | - | - |
$2,556 28,980 kWh |
$2,704 207 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,323 Cost: - |
$1,616 | 18,321 | $707 | 54 | - | - | - | - | - | - | - | - |
$1,616 18,321 kWh |
$707 54 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $747 Cost: $400 |
$363 | 4,120 | $384 | 29 | - | - | - | - | - | - | - | - |
$363 4,120 kWh |
$384 29 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $12,600 Cost: $11,000 |
- | - | - | - | - | - | $12,600 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$12,600 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $4,246 Cost: $342 |
- | - | - | - | - | - | - | - | - | - | $4,246 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$4,246 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $401,960 Cost: $800,000 |
- | - | - | - | - | - | - | - | $401,960 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$401,960 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.5194 REDESIGN PROCESS |
Savings: $55,557 Cost: $24,000 |
- | - | - | - | - | - | - | - | $55,557 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$55,557 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $752,603 Cost: $2,213,392 |
$168,989 | 1,916,881 | $75,581 | 5,774 | $33,670 | 63,637 | $12,600 | - | $457,517 | - | $4,246 | - | $168,989 1,916,881 kWh |
$75,581 5,774 kW-months/year |
$33,670 63,637 MMBtu |
$12,600 - lb |
$457,517 - $ |
$4,246 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $272,233 Cost: $1,371,000 |
$166,070 | 1,883,781 | $72,493 | 5,538 | $33,670 | 63,637 | - | - | - | - | - | - | $166,070 1,883,781 kWh |
$72,493 5,538 kW-months/year |
$33,670 63,637 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||