IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0495 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,370 $6,127 Implemented
SF0495 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,562 $3,136 Not Implemented
SF0495 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,447 $8,329 Implemented
SF0495 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $2,590 $6,532 Implemented
SF0495 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,109 $0 Not Implemented
SF0495 # 01 Y:2016 01 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,207 $661 Implemented
UD0956 # 10 Y:2016 10 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,204 $10,000 Not Implemented
UD0956 # 09 Y:2016 09 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,433 $40,000 Not Implemented
UD0956 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,966 $3,394 Not Implemented
UD0956 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,566 $24,600 Not Implemented
UD0956 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $26,938 $30,000 Not Implemented
UD0956 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $8,199 $12,220 Not Implemented
UD0956 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,229 $0 Not Implemented
UD0956 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,897 $12,000 Not Implemented
UD0956 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,421 $14,000 Not Implemented
UD0956 # 01 Y:2016 01 2016 INSTALL TURBULATORS $15,641 $5,625 Not Implemented
UD0956 # 11 Y:2016 11 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,070 $2,500 Not Implemented
UD0956 # 12 Y:2016 12 2016 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $198,366 $360,000 Not Implemented
TT0166 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,393 $585 Not Implemented
TT0166 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,809 $3,000 Implemented
TT0166 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $3,337 $3,980 Not Implemented
TT0166 # 05 Y:2016 05 2016 INSTALL SUB-METERING EQUIPMENT $11,364 $600 Implemented
TT0166 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $11,418 $8,000 Implemented
TT0166 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,168 $13,756 Implemented
TT0166 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $13,610 $7,891 Not Implemented