Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 2051 | Bread, Cake, And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0495 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,370 | $6,127 | Implemented |
SF0495 # 03 Y:2016 | 03 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,562 | $3,136 | Not Implemented |
SF0495 # 04 Y:2016 | 04 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,447 | $8,329 | Implemented |
SF0495 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $2,590 | $6,532 | Implemented |
SF0495 # 06 Y:2016 | 06 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,109 | $0 | Not Implemented |
SF0495 # 01 Y:2016 | 01 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,207 | $661 | Implemented |
UD0956 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,421 | $14,000 | Not Implemented |
UD0956 # 12 Y:2016 | 12 | 2016 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $198,366 | $360,000 | Not Implemented |
UD0956 # 03 Y:2016 | 03 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,897 | $12,000 | Not Implemented |
UD0956 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,229 | $0 | Not Implemented |
UD0956 # 05 Y:2016 | 05 | 2016 | OPTIMIZE PLANT POWER FACTOR | $8,199 | $12,220 | Not Implemented |
UD0956 # 06 Y:2016 | 06 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $26,938 | $30,000 | Not Implemented |
UD0956 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,566 | $24,600 | Not Implemented |
UD0956 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $1,966 | $3,394 | Not Implemented |
UD0956 # 09 Y:2016 | 09 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,433 | $40,000 | Not Implemented |
UD0956 # 10 Y:2016 | 10 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,204 | $10,000 | Not Implemented |
UD0956 # 11 Y:2016 | 11 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,070 | $2,500 | Not Implemented |
UD0956 # 01 Y:2016 | 01 | 2016 | INSTALL TURBULATORS | $15,641 | $5,625 | Not Implemented |
TT0166 # 10 Y:2016 | 10 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $138 | $120 | Implemented |
TT0166 # 09 Y:2016 | 09 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $520 | $20 | Not Implemented |
TT0166 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $1,393 | $585 | Not Implemented |
TT0166 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,809 | $3,000 | Implemented |
TT0166 # 06 Y:2016 | 06 | 2016 | INSULATE BARE EQUIPMENT | $3,337 | $3,980 | Not Implemented |
TT0166 # 05 Y:2016 | 05 | 2016 | INSTALL SUB-METERING EQUIPMENT | $11,364 | $600 | Implemented |
TT0166 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,418 | $8,000 | Implemented |