IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 2052 Cookies And Crackers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0423 # 07 Y:2009 07 2009 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $217,707 $718,800 Not Implemented
SD0423 # 06 Y:2009 06 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,887 $14,667 Not Implemented
SD0423 # 05 Y:2009 05 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,107 $5,200 Not Implemented
SD0423 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,335 $300 Not Implemented
SD0423 # 03 Y:2009 03 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $19,013 $4,062 Not Implemented
SD0423 # 02 Y:2009 02 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $995 $130 Not Implemented
SD0423 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,697 $0 Not Implemented
SD0421 # 07 Y:2009 07 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $60,774 $175,800 Not Implemented
SD0421 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,500 $6,463 Not Implemented
SD0421 # 02 Y:2009 02 2009 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $35,684 $50,000 Implemented
SD0421 # 03 Y:2009 03 2009 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $94,850 $12,450 Not Implemented
SD0421 # 04 Y:2009 04 2009 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $269,651 $1,430,000 Not Implemented
SD0421 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,149 $2,700 Implemented
SD0421 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,991 $16,630 Not Implemented
SD0421 # 08 Y:2009 08 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $568 $1,444 Implemented
IC0156 # 09 Y:2009 09 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,278 $7,995 Not Implemented
IC0156 # 12 Y:2009 12 2009 INSTALL TIMERS AND/OR THERMOSTATS $1,299 $0 Implemented
IC0156 # 11 Y:2009 11 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,559 $2,887 Implemented
IC0156 # 10 Y:2009 10 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $934 $0 Implemented
IC0156 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,513 $1,610 Not Implemented
IC0156 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $4,792 $15,044 Implemented
IC0156 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,309 $5,917 Implemented
IC0156 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,483 $29,250 Implemented
IC0156 # 04 Y:2009 04 2009 DISCONNECT BALLASTS $2,089 $2,200 Implemented
IC0156 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,116 $1,649 Implemented