Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
174
matching recommendationsSIC | 2053 | Frozen Bakery Products, Except Bread |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0133 # 01 Y:2020 | 01 | 2020 | INSTALL OCCUPANCY SENSORS | $1,574 | $343 | Not Implemented |
IP0133 # 02 Y:2020 | 02 | 2020 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $2,073 | $1,218 | Not Implemented |
IP0133 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,033 | $14,189 | Not Implemented |
IP0133 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $618 | $553 | Not Implemented |
IP0133 # 05 Y:2020 | 05 | 2020 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,196 | $4,991 | Not Implemented |
OK0988 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $739 | $2,330 | Not Implemented |
OK0988 # 04 Y:2018 | 04 | 2018 | USE SOLAR HEAT TO HEAT WATER | $4,920 | $155,149 | Not Implemented |
OK0988 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $7,394 | $12,000 | Not Implemented |
OK0988 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,279 | $15,642 | Not Implemented |
SU0461 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,315 | $0 | Not Implemented |
SU0461 # 05 Y:2018 | 05 | 2018 | REPLACE BOILER | $10,937 | $22,000 | Not Implemented |
SU0461 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,640 | $27,679 | Implemented |
SU0461 # 02 Y:2018 | 02 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,138 | $700 | Implemented |
SU0461 # 07 Y:2018 | 07 | 2018 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $315 | $955 | Implemented |
SU0461 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $910 | $651 | Not Implemented |
SU0461 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $272 | $397 | Implemented |
BS0068 # 01 Y:2015 | 01 | 2015 | USE OPTIMUM THICKNESS INSULATION | $70 | $51 | Not Implemented |
BS0068 # 02 Y:2015 | 02 | 2015 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,272 | $5,853 | Not Implemented |
BS0068 # 03 Y:2015 | 03 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $1,060 | $4,455 | Not Implemented |
BS0068 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM THICKNESS INSULATION | $29 | $100 | Not Implemented |
BS0068 # 05 Y:2015 | 05 | 2015 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,480 | $11,240 | Not Implemented |
LE0315 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,689 | $40 | Not Implemented |
LE0315 # 05 Y:2011 | 05 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,864 | $50,000 | Implemented |
LE0315 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,359 | $25,500 | Not Implemented |
LE0315 # 04 Y:2011 | 04 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $22,464 | $250 | Implemented |