Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 2053 | Frozen Bakery Products, Except Bread |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0315 # 09 Y:2011 | 09 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,370 | $249 | Implemented |
LE0315 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,370 | $2,000 | Not Implemented |
LE0315 # 07 Y:2011 | 07 | 2011 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,281 | $20,000 | Not Implemented |
LE0315 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,689 | $40 | Not Implemented |
LE0315 # 05 Y:2011 | 05 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,864 | $50,000 | Implemented |
LE0315 # 04 Y:2011 | 04 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $22,464 | $250 | Implemented |
LE0315 # 03 Y:2011 | 03 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,842 | $2,500 | Not Implemented |
LE0315 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,359 | $25,500 | Not Implemented |
LE0315 # 01 Y:2011 | 01 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $404,827 | $2,200,000 | Not Implemented |
HO0231 # 15 Y:2000 | 15 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $2,880 | $200 | Not Implemented |
HO0231 # 19 Y:2000 | 19 | 2000 | TREAT AND REUSE RINSE WATERS | $4,617 | $10,100 | Not Implemented |
HO0231 # 18 Y:2000 | 18 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $7,809 | $2,360 | Implemented |
HO0231 # 17 Y:2000 | 17 | 2000 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $79,092 | $7,100 | Implemented |
HO0231 # 16 Y:2000 | 16 | 2000 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,980 | $20,017 | Not Implemented |
HO0231 # 01 Y:2000 | 01 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,008 | $0 | Implemented |
HO0231 # 14 Y:2000 | 14 | 2000 | INSTALL CONTINUOUS LUBRICATION EQUIPMENT | $5,850 | $20,000 | Not Implemented |
HO0231 # 13 Y:2000 | 13 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $12,375 | $1,075 | Implemented |
HO0231 # 12 Y:2000 | 12 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $15,600 | $3,000 | Implemented |
HO0231 # 11 Y:2000 | 11 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $15,600 | $300 | Not Implemented |
HO0231 # 10 Y:2000 | 10 | 2000 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $73,575 | $0 | Implemented |
HO0231 # 09 Y:2000 | 09 | 2000 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $85,091 | $4,000 | Not Implemented |
HO0231 # 08 Y:2000 | 08 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $398 | $0 | Implemented |
HO0231 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,373 | $2,790 | Implemented |
HO0231 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,350 | $3,000 | Not Implemented |
HO0231 # 05 Y:2000 | 05 | 2000 | MOVE BOILER TO MORE EFFICIENT LOCATION | $1,070 | $200 | Not Implemented |