Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
449
matching recommendationsSIC | 206 | Sugar And Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0538 # 02 Y:2019 | 02 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $29,680 | $12,500 | Implemented |
SF0538 # 03 Y:2019 | 03 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $15,353 | $5,947 | Implemented |
SF0538 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,440 | $7,616 | Implemented |
SF0538 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,101 | $5,998 | Implemented |
SF0538 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,533 | $34,367 | Implemented |
SF0538 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,565 | $11,649 | Implemented |
SU0475 # 01 Y:2019 | 01 | 2019 | PAY BILLS ON TIME TO AVOID LATE FEES | $388 | $0 | Implemented |
LE0447 # 03 Y:2018 | 03 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $64,766 | $55,000 | Implemented |
LE0447 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,075 | $800 | Implemented |
MI0314 # 08 Y:2017 | 08 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,679 | $290 | Implemented |
MI0314 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,364 | $1,125 | Implemented |
MI0314 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,595 | $12,009 | Implemented |
MI0314 # 03 Y:2017 | 03 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,444 | $3,600 | Implemented |
MI0314 # 01 Y:2017 | 01 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,333 | $6,560 | Implemented |
LE0411 # 01 Y:2016 | 01 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $22 | $0 | Implemented |
LE0411 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,142 | $25 | Implemented |
LE0411 # 03 Y:2016 | 03 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,533 | $150 | Implemented |
LE0411 # 04 Y:2016 | 04 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $3,292 | $625 | Implemented |
LE0411 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $21,409 | $9,106 | Implemented |
LE0411 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,675 | $1,000 | Implemented |
LE0411 # 08 Y:2016 | 08 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $58,696 | $100,000 | Implemented |
LE0411 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,246 | $16,912 | Implemented |
DL0138 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,660 | $21,550 | Implemented |
DL0138 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,645 | $13,720 | Implemented |
DL0138 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,280 | $61,980 | Implemented |