IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

998

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0455 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $94,396 $0 Implemented
SF0455 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $638 $280 Implemented
SF0455 # 04 Y:2014 04 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $14,213 $10,295 Implemented
SF0455 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $232,437 $204,574 Implemented
SF0455 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $11,569 Implemented
SF0455 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,151 $3,742 Implemented
SF0455 # 08 Y:2014 08 2014 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $13,254 $19,582 Implemented
SF0455 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,651 $2,966 Implemented
SF0455 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,078 $103,067 Implemented
SF0455 # 12 Y:2014 12 2014 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $43,986 $154,938 Implemented
SF0455 # 13 Y:2014 13 2014 INSTALL OCCUPANCY SENSORS $5,163 $31,786 Implemented
SF0455 # 14 Y:2014 14 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,061 $12,152 Implemented
IP0023 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,826 $0 Not Implemented
IP0023 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $251 $0 Not Implemented
IP0023 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,844 $59 Not Implemented
IP0023 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $66 $13 Not Implemented
IP0023 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $43 $30 Not Implemented
IP0023 # 06 Y:2014 06 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,202 $1,970 Not Implemented
IP0023 # 07 Y:2014 07 2014 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $20,119 $16,444 Not Implemented
IP0023 # 08 Y:2014 08 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,491 $2,716 Not Implemented
IP0023 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $245 Not Implemented
BS0019 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $187 $364 Not Implemented
BS0019 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $342 $349 Implemented
BS0019 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $84 $157 Not Implemented
BS0019 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $41 $81 Implemented