Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,009

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0315 # 08 Y:2003 08 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,584 $600 Implemented
LE0151 # 01 Y:2003 01 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,947 $3,000 Implemented
LE0151 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,069 $0 Not Implemented
LE0151 # 03 Y:2003 03 2003 USE OPTIMUM THICKNESS INSULATION $51,426 $6,735 Implemented
LE0151 # 04 Y:2003 04 2003 USE SYNTHETIC LUBRICANT $7,733 $1,000 Not Implemented
LE0151 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,064 $4,425 Implemented
LE0151 # 06 Y:2003 06 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,947 $0 Not Implemented
LE0151 # 07 Y:2003 07 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,270 $0 Not Implemented
LE0151 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,121 $1,000 Implemented
UU0032 # 01 Y:2002 01 2002 MOVE BOILER TO MORE EFFICIENT LOCATION $83 $86 Not Implemented
UU0032 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,155 $12,000 Not Implemented
UU0032 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $988 $2,604 Not Implemented
UU0032 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $4,743 $600 Not Implemented
UU0032 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,517 $17,563 Not Implemented
UU0032 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,273 $343 Not Implemented
SF0183 # 01 Y:2000 01 2000 USE PHOTOCELL CONTROLS $718 $1,080 n/a
SF0183 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $255 $638 n/a
SF0183 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $188 $480 n/a
SF0183 # 04 Y:2000 04 2000 USE PHOTOCELL CONTROLS $397 $1,400 n/a
SF0183 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,379 $1,915 n/a
SF0183 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,703 $654 n/a
UF0238 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,479 $7,893 Not Implemented
UF0238 # 02 Y:1999 02 1999 USE OPTIMUM THICKNESS INSULATION $1,894 $1,361 Implemented
UF0238 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,287 $0 Implemented
UF0238 # 04 Y:1999 04 1999 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $584 $20 Implemented