Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
282
matching recommendationsSIC | 206 | Sugar And Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0542 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,409 | $1,384 | Implemented |
SF0542 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,079 | $180 | Not Implemented |
SF0542 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,796 | $1,080 | Implemented |
SF0542 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,762 | $0 | Implemented |
SF0541 # 08 Y:2019 | 08 | 2019 | INSULATE BARE EQUIPMENT | $2,727 | $8,304 | Implemented |
SF0541 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,964 | $5,000 | Implemented |
SF0541 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,815 | $1,514 | Implemented |
SF0541 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,931 | $15,969 | Implemented |
SF0541 # 04 Y:2019 | 04 | 2019 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $1,697 | $1,327 | Implemented |
SF0541 # 09 Y:2019 | 09 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $36,428 | $115,019 | Implemented |
SF0541 # 10 Y:2019 | 10 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,140 | $26,538 | Implemented |
SF0541 # 11 Y:2019 | 11 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $49,416 | $245,226 | Not Implemented |
SF0541 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,599 | $153,278 | Implemented |
SF0541 # 06 Y:2019 | 06 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $261 | $578 | Implemented |
SF0541 # 05 Y:2019 | 05 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $7,042 | $7,678 | Implemented |
SF0538 # 01 Y:2019 | 01 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $146,044 | $0 | Not Implemented |
SF0538 # 09 Y:2019 | 09 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $238,211 | $1,672,972 | Not Implemented |
SF0538 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,533 | $34,367 | Implemented |
SF0538 # 02 Y:2019 | 02 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $29,680 | $12,500 | Implemented |
SF0538 # 03 Y:2019 | 03 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $15,353 | $5,947 | Implemented |
SF0538 # 04 Y:2019 | 04 | 2019 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $27,526 | $16,915 | Not Implemented |
SF0538 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,101 | $5,998 | Implemented |
SF0538 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,565 | $11,649 | Implemented |
SF0538 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,440 | $7,616 | Implemented |
SF0455 # 04 Y:2014 | 04 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $14,213 | $10,295 | Implemented |