IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0444 # 08 Y:2012 08 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,828 $32,000 Not Implemented
NC0444 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,193 $53,707 Not Implemented
NC0444 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,844 $62,067 Not Implemented
NC0444 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,178 $971 Implemented
NC0444 # 04 Y:2012 04 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,902 $4,000 Implemented
NC0444 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,731 $500 Implemented
NC0444 # 02 Y:2012 02 2012 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $3,445 $8,500 Not Implemented
NC0444 # 01 Y:2012 01 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $5,257 $2,000 Implemented
NC0260 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $234 $0 Not Implemented
NC0260 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $806 $550 Not Implemented
NC0260 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $264 $252 Not Implemented
NC0260 # 07 Y:2003 07 2003 DEVELOP A REPAIR/REPLACE POLICY $347 $260 Not Implemented
NC0260 # 05 Y:2003 05 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,263 $16,548 Not Implemented
NC0260 # 04 Y:2003 04 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $606 $176 Not Implemented
NC0260 # 03 Y:2003 03 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $16,074 $9,000 Not Implemented
NC0260 # 02 Y:2003 02 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $19,437 $8,000 Not Implemented
NC0260 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $396 $208 Not Implemented
TN0574 # 01 Y:1996 01 1996 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $115,000 $140,000 Not Implemented
TN0574 # 07 Y:1996 07 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $500 $300 Implemented
TN0574 # 06 Y:1996 06 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,000 $0 Implemented
TN0574 # 05 Y:1996 05 1996 ELIMINATE/REDUCE AN OPERATION $5,000 $9,000 Not Implemented
TN0574 # 04 Y:1996 04 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,000 $0 Not Implemented
TN0574 # 03 Y:1996 03 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,000 $600 Not Implemented
TN0574 # 02 Y:1996 02 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $79,000 $22,000 Implemented