IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0012 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,398 $400 Not Implemented
ND0012 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $200 $468 Not Implemented
ND0012 # 03 Y:1991 03 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $280 $250 Not Implemented
ND0012 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8 $0 Not Implemented
WI0126 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $533 $640 Not Implemented
WI0126 # 09 Y:1991 09 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $608 $0 Not Implemented
WI0126 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $810 $2,124 Not Implemented
WI0126 # 07 Y:1991 07 1991 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $1,665 $0 Not Implemented
WI0126 # 06 Y:1991 06 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $782 $0 Not Implemented
WI0126 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $2,078 $1,600 Not Implemented
WI0126 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,563 $500 Not Implemented
WI0126 # 03 Y:1991 03 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $2,491 $10,000 Not Implemented
WI0126 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,921 $865 Not Implemented
WI0126 # 01 Y:1991 01 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,767 $14,000 Not Implemented
TN0425 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,698 $760 Not Implemented
TN0425 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,398 $0 Not Implemented
TN0425 # 03 Y:1991 03 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,594 $0 Not Implemented
TN0425 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $20,275 $0 Not Implemented
TN0425 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $73,469 $87,400 Not Implemented
AM0112 # 01 Y:1991 01 1991 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,470 $5,000 Not Implemented
AM0112 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $195 $235 Not Implemented
AM0112 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $340 $310 Not Implemented
AM0112 # 03 Y:1991 03 1991 REPAIR AND ELIMINATE STEAM LEAKS $3,900 $365 Not Implemented
AM0112 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $4,670 $19,000 Not Implemented